Project Portfolio

Selected offshore workforce and scaffolding projects delivered across drilling contractors and energy operators in the region.

15+

Offshore Rigs Supported

80+

Offshore Personnel Deployed

Multiple

Scaffolding Projects Executed

Ongoing

Offshore Operations Since 2024

PROJECT LISTINGS

Offshore Rig Painting Workforce Deployment – ADES

Client: ADES (Offshore Drilling Contractor)
Scope: Offshore Workforce Supply
Duration: Ongoing since April 2024
Coverage: Across multiple offshore drilling rigs

Project Overview:

Deployment of approximately 40 offshore rig painters supporting ADES drilling operations. Personnel are engaged in ongoing maintenance and coating activities aligned with offshore safety, compliance, and operational standards across multiple rigs.

Offshore Rig Painting Workforce Deployment – ARO

Client: ARO Drilling
Scope: Offshore Workforce Supply
Duration: July 2024 – September 2024
Coverage: Three offshore drilling rigs

Project Overview:

Provision of offshore painting personnel supporting drilling rig operations under ARO. Workforce deployment was aligned with maintenance schedules and offshore operational requirements.

Integrated Tower + Hanging Platform

Multi-level access scaffold constructed above seawater to support topside maintenance activities.

Scope included engineered hanging platform integration, stair access, inspection controls, and dismantling.

35m Cantilever Scaffold on Tower Crane

Engineered cantilever access platform constructed to support gantry sheave replacement under offshore dynamic loading conditions.

Included structural tie-ins, bracing reinforcement, and high-elevation access control.

Supervision &
inspection

Material rental
supply

Installation & dismantling

Operational rig access maintenance

Offshore Scaffolding Workforce Deployment

Client: Offshore Rig Operator
Scope: Scaffolding Workforce Support

Project Overview:

Deployment of qualified scaffolding personnel providing structured access support for offshore maintenance and operational requirements.

Mud Engineering Workforce Deployment – Cahyamata

Client: Cahyamata Group
Scope: Technical Workforce Supply

Project Overview:

Deployment of approximately 40 mud engineers supporting drilling operations, delivering technical expertise aligned with operational performance and safety requirements.

Need Experienced Offshore Workforce or Scaffolding Execution Support?

Connect with our team to discuss offshore manpower deployment, scaffolding project execution, and technical workforce solutions aligned with your operational standards.

Request Project Details